Encon Thermal EngineersAbout UsEncon Thermal EngineersTechnologiesEncon Thermal EngineersCase StudiesEncon Thermal EngineersMediaEncon Thermal EngineersBusiness Opportunity Encon Thermal EngineersQuestionnaireEncon Thermal EngineersContacts Home Page
 
encon, encon thermal, burners, High Velocity Burners, IIP-Encon Film Burner, Recuperators, Rad Heat Gas Elements, Energy consultant ENCON Thermal Engineers Pvt. Ltd. 
Answer To The Continued Need For Energy Conservation & Conversion
D&B D-U-N-S® Number: 65-041-1333
Encon Thermal Engineers, An ISO 9001:2008 certified company
 
Encon Products
Ovens
RAD-Heat Gas Elements
Ladle Preheating Systems
Launder Preheating Systems
Tundish Preheating Systems
Oxy fuel Systems
Furnaces
Recuperators
Blowers
Burners
Heating & Pumping Units
Raycon Systems
Gasifiers
Hot Air Generators
Conveyors
Encon India
 
Follow us
 
 
Case Study 6
 
PLANT DESCRIPTION
- The Furnace was initially designed by OFAG, Germany.
- Rated Capacity 30 to 32 Ton/hr.
- Bull Nose Design.
 
PROBLEMS FACED
- Frequent failures of the 'Roof' and 'Bull-nose' of the Furnace
- High Fuel Consumption (up to 42 ltr/ton)
- Scale loss as high as 2%
- No Auto controls
- Interrupted production
 
MODIFICATIONS CARRIED BY ENCON
Furnace Modification
  • Except for Hearth and 2 meters of Preheating Zone the complete furnace was redesigned.
  • 'Bull Nose' was changed to 'Camel Hump' design.
  • Change in the design of the Roof Bricks and Hangers for longevity.
Combustion System
  • Soaking zone burners were retained as LAP burners
  • Heating zone burners were changed to High Velocity with their placement done on side walls for uniformty
Level 1 Automation incorporated - Automatic temperature control
  • This was achieved by placing 6 thermocouples in the furnace, 3 Thermocouples were placed in the soaking zone and 3 Thermocouples were placed in preheating zone.
  • The air to fuel ratio was governed by a combination valve.
  • The Furnace controls were divided into 6 zones - 3 in soaking zone and 3 in Preheating zone.
BEFORE AFTER
 
RESULTS
- SFC 32.6 ltr/Ton (earlier 42 ltr/ton)
- Scaling is down to 1%(earlier 2%)
- Continuous operations for 2 years (earlier breakdowns every 3 months)
- Uninterrupted yield of the rated capacity of 33-35 Ton/hr.
 
  ENCON Profile
CEO Message
Landmarks
Clients
Awards
R & D
Career with us
  RAD Heat
OXY Fuel
Hybrid Technologies
Other Technologies
  Case Study 1
Case Study 2
Case Study 3
Case Study 4
Case Study 5
Case Study 6
  Publications
Presentations
Catalogue
Videos
  Home Page
Business Opportunity
Questionnaire
Contact Us