| YEAR |
ACHIVEMENTS / LANDMARKS |
|
| 1978 |
Condensate recovery system with water preheater from boiler waste gases. |
Image |
| |
Development of Indegenous Recuperator. |
|
| 1979 |
Conversion of Oil Fired Boiler to Coal cum Wood Firing. Designing of 4-5 tonnes per hour BRHF. |
Image |
| 1984 |
Supplied 12 BRHFs to one forging plant in Gujrat, with all new concepts. Achieving 30% savings. |
|
| 1985 |
Retrofitted a 100 sq. meter surface area for VISC, Bhadrawati, Karnataka with indigenous materials and designs. |
Image |
| |
Introduction of IIP-ENCON film burner, which is an icon in international industry now. |
Image |
| 1986 |
Constructed one-third super structure area at RCF, Kapurthala. Project directly surveillance of Hon. Rajiv Gandhi. |
|
1989
|
First Indegenous Recuperator Ladle with engineers of Mukand Ltd, Bombay. Step wise improvements resulted in 75% savings. |
Image |
| 1991 |
First BRHF supplied on turnkey basis to Kenya with new concept of Ceramic Fibre Lining. |
Image |
| 1992 |
Introduction of Mono Block Pressure Jet Burners in non-ferrous melting & other applications. |
|
| 1993 |
Constructed largest single span bridge in the country over River Chennab. Total job was completed in 6 months. |
Image |
| |
Introduction of Hydraulic lifting and lowering mechanism for 90 tonne ladle heating station. |
|
| 1994 |
Major breakthrough in Aluminium melting technology by introducing Ceramic Fibre Lining & Mono Block Burner. Resulted in 95% saving in Electrical energy & 30% in oil consumption. |
Image |
| 1995 |
Advent of rationalising the use of energy- Converted electrical heating to indirect oil firing. |
|
| 1996 |
Modernised and redesigned a 45 TPH / BRHF at Tata SSL, Tarapore on a modest investment of $150,000, they are saving $100,000 per month. |
Image |
| 1999 |
Won the first prize for "Introducing the Best Technology" during Tech Mart at IITF. |
Image |
| 2000 |
Development of Indegenous Industrial gas burner by our R&D Centre. Project sponsored by Ministry of Science & Technology and GAIL, in partnership with IIP, achieved savings upto 16% in Industrial Gas Burners. |
|
| 2001 |
ISUZU commercial vehicle coming through our ovens. |
Image |
| 2002 |
Recuperator exported to Jordan for 60 tons/hr walking Beam Billet Reheating Furnaces. Retrofitting of the Recuperator resulted in 3% more efficiency. |
Image |
| 2003 |
Toyota-Prado out of our Oven. |
Image |
| |
Won the "EXCELLENCE IN TECHNOLOGY" from CII at IETF. |
Image |
| 2005 |
7 Meter high oven designed and manufactured by ENCON for Areva
(Order has already been repeated thrice). |
Image |
| 2006 |
Advent of Raycon system to dry patch up line in induction furnaces. |
Image |
| |
Coal Gasifier supplied to Dhiman Iron & Steel Industries Ltd. |
Image |
| |
Sand Dryer supplied to Tirath Alloys Ltd. |
Image |
| 2007 |
160 ft long conveyrised HYBRID oven (Solar- Gas-Electric) for medicine drying. |
Image |
| |
Tundish Pre-heater supplied to DANIELI Engineering India Ltd. |
Image |